Design Build vs Design Bid Build: Which Fits Your Chicago Job?

Both delivery methods end with a permit and a finished building. The difference is who you hire first, and who owns the gaps.

Design build vs design bid build comes down to one question: do you want one company responsible for the drawings and the construction, or do you want to hire the designer first and then hire a contractor to build what the designer drew? Neither is better in general. Which fits depends on how well you already know the scope, and on how much of the risk you want to hold yourself.

What is the difference between design-build and design-bid-build?

In design-bid-build, you hire an architect or engineer first. They produce drawings. Then contractors bid on those drawings, you pick one, and that contractor builds it. You hold two contracts, one with the designer and one with the builder.

In design-build, one company signs one contract with you for both the design and the construction. The design professionals might be on staff, or the builder might coordinate them as partners. Either way, you deal with one team from first sketch to final inspection. (Akats works this way: we coordinate drawings with licensed design professionals, then build.)

Design-bid-buildDesign-build
Contracts you signTwo: designer, then builderOne team
When the builder joinsAfter drawings are doneAt the start
Who sees conflicts firstYou, usuallyThe team
Price known whenAfter biddingAs design firms up

Does a Chicago permit require an architect either way?

Sometimes, and the delivery method does not change that. The City decides, based on the work, not on how you hired.

For most repair work, no. The City's guidance is that most Express-eligible repair work needs no architect or engineer documents. Tuckpointing, patching and similar repairs usually go through the Express Permit Program without drawings.

For anything plan-based, yes. Any plan-based permit requires plans prepared by an Illinois-licensed architect or engineer. For most projects that means an architect or a structural engineer. A professional engineer who is not a structural engineer fits only a limited range. Specific triggers the City lists include a lintel over 6 feet and concrete repair over 100 square feet, plus roof structural repairs and structural porch repair.

The Standard Plan Review path is the main route when plans are needed, and it requires an architect to prepare the drawings. Every project in that program also needs zoning approval.

So a design-build firm does not skip the licensed professional. It organizes the work around one. If you want the full picture of when the City requires one, read when Chicago requires an architect or engineer.

Who is responsible for the drawings?

The licensed professional who prepares and seals them. That is true under either method.

Chicago's Self-Cert program shows it clearly: an Illinois-licensed architect or structural engineer who completed City training seals the drawings and takes full responsibility for code compliance. Expediters are not allowed to assist with uploading self-certified applications.

What changes between the two methods is who is accountable to you when the drawings and the field conditions disagree:

Whichever method you pick, check each license yourself. The City has a Contractor License Lookup, and a Permit Professionals lookup for architects and expediters. IDFPR covers architects, engineers and roofers.

When does design-build fit?

Design-build tends to fit when:

When does design-bid-build fit?

It tends to fit when:

It also has a real downside on older buildings. Bids are only as good as the drawings behind them, and open walls in a hundred-year-old building change drawings. Changes after bidding become change orders. Our guide on how design-build change orders work covers that either way.

What drives the cost

We do not quote ranges in an article. Cost differences between the two methods come from scope clarity, how many surprises show up after demolition, how many rounds of redrawing happen, and how much time passes between design and permit. Anyone who tells you design-build is always cheaper, or always more expensive, is selling something.

How do you choose?

Ask yourself four questions:

  1. Is the scope already fixed? If yes, either method works. If no, design-build has an edge.
  2. Is there a deadline? A violation, a closing, a tenant move-in. A single team helps.
  3. Do I want to manage two relationships? Some owners do. Most do not.
  4. Do I have a reason to want an independent designer? If so, design-bid-build keeps the roles separate.

If the work is a repair that the City handles through Express Permits, you may not need either method. You need a licensed contractor. The City allows only one general contractor on a project at a time, so be clear about who holds that role.

Want to compare notes on your building? Start with our design-build guide, then see how to choose a design-build firm before you sign anything. When you are ready for a straight read on scope, our design-build team will look at the building with you.

Common questions

In design-bid-build you hire an architect first, then contractors bid on the finished drawings. In design-build one company is under contract for both design and construction. A licensed Illinois design professional still seals the drawings when the City requires plans.

There is no honest general answer. Cost depends on how clear the scope is, how many surprises the building holds, and how many times the drawings change. Ask each firm to explain what is included and how changes are priced, rather than comparing one number.

If the City requires plan-based permit drawings, yes. They must come from an Illinois-licensed architect or engineer. A design-build firm coordinates that professional instead of replacing them. Many repair jobs need no architect at all.

Who applies depends on the permit type. Express permits list the licensed contractors on the job. Self-certified applications must come from the registered architect or structural engineer, and expediters cannot upload them. Check the Department of Buildings for the route your project takes.

Where to go from here

Sources

  1. City of Chicago: Guide to Building Permits: When Is a Licensed Architect or Engineer Required?
  2. City of Chicago, Department of Buildings: Standard Plan Review Permit Program
  3. City of Chicago, Department of Buildings: Self-Certified Permit Application Program
  4. City of Chicago, Department of Buildings: General Contractor License
  5. City of Chicago, Department of Buildings: Trade Licensing
  6. City of Chicago: Express Permit Program: Masonry Work

Facts last checked: October 7, 2026.

This article explains general rules and common situations in Chicago. It is not legal advice, and City rules change. For a specific property, check with the Chicago Department of Buildings or a licensed professional.

Talk to Akats

Planning a bigger project?

Akats coordinates drawings, permits and construction under one contract. Tell us what you want to build.