Permits and Licensing · Article

Chicago Building Permit Cost: How Permit Fees Are Figured

There is no single Chicago permit price. Here is what drives the number, what is separate from it, and how to get the real figure for your job.

Short answer

Chicago does not charge one flat price for a building permit. The fee depends on the permit program and the work, and it is set in the City's fee provisions, which change. We do not quote a figure because any number we print can be out of date. This article explains what shapes the fee, what costs sit outside it, when it triples, and who may qualify for a waiver.

The first thing most owners ask is "what will the permit cost?" The honest answer is that the City, not a contractor and not a blog, sets that number, and it varies by job. You get the real figure from the Department of Buildings for your scope. What we can do is show you what moves it, so the estimate you receive makes sense. For the whole permit process, start with the Chicago building permits guide.

Why we will not print a permit fee table

Permit fees come from the Municipal Code and the City's fee schedule, and both get amended. A printed table goes stale, and an owner who budgets from a stale table is the one who pays the difference. When the Department of Buildings lists the code sections that govern a masonry permit, it points to the fee provisions in chapter 14A-12 of the code (City of Chicago). That tells you the fee is a matter of code and fee schedule, not negotiation.

So the useful questions are not "how much is the fee" but "what is the fee based on" and "what else is on the bill." We answer both below. For the number itself, check with the Department of Buildings or have your contractor or expediter pull the current fee for your scope in writing.

What shapes the permit fee

Even without a table, these factors decide which fee schedule applies and how big the number gets:

If a contractor gives you a permit number as a flat round amount without asking what the work is, treat it as a placeholder, not a quote.

What sits outside the permit fee

Owners get surprised here more than anywhere. The City permit fee is one line. These are separate:

When you compare bids, ask each contractor to list the permit fee, drawings, expediting, public way permits and the construction price as separate lines. That way you are comparing the same things.

When the permit fee triples

The one fee fact the City states plainly is the penalty for skipping the permit. When a City employee finds unpermitted work, a stop work order is posted. Work can resume only after the required permit is obtained and the stop-work penalty, which the City lists as $1,000 or more, is paid. In most cases the permit fee is tripled, the City may start an enforcement case, and the owner may have to correct or remove the work at their own expense (City of Chicago). The City page that states this was checked October 2026. Confirm the current amounts with the Department of Buildings.

The math is simple. A permit pulled on time costs the permit fee. A permit pulled after the fact costs a tripled fee plus the penalty, plus whatever it costs to open walls or redo work for inspectors. We cover that path in getting work done without a permit onto the record and what happens when a Chicago permit catches up with you.

Is there a fee waiver?

Yes, for some owners. The City offers a permit fee waiver for long-term senior homeowners, age 65 and older, who meet income criteria, for repairs and alterations on one to three unit residential buildings they live in (City of Chicago). The criteria and the paperwork are specific. We walk through them in the Chicago senior homeowner permit fee waiver. Confirm eligibility with the Department of Buildings before you assume it applies.

How to get the real number

  1. Define the scope in writing. What is removed, what is replaced, how much, on which part of the building.
  2. Ask which permit types the job needs. Masonry, porch, reroof, electrical and plumbing are different permits.
  3. Ask for the current fee from the Department of Buildings or have your expediter confirm it.
  4. Separate the lines on every estimate: permit, drawings, expediting, public way, construction.
  5. Ask what happens if inspectors require more. Corrections cost money, and so do re-inspections.
What drives the cost

The permit fee itself follows the City's fee schedule for your permit type and scope. The bigger swing factors are around it: whether you need drawings, whether you need more than one permit, whether the public way is involved, and whether work started before the permit existed. Timing matters too: see what sets the clock on a Chicago permit.

What we do

We tell owners the number from the City, not a guess. Our expediting team scopes the work, identifies which permits it needs, pulls the current fees and sends you an itemized breakdown before any work begins.

Common questions

It depends on the permit type and the scope of work, and the City's fee schedule changes, so any printed figure goes stale. Ask the Department of Buildings, or have your contractor or expediter confirm the current fee in writing for your exact scope.

The City sets fees by permit type under its code and fee schedule, and how scope is measured depends on that type. We do not claim a single formula. Ask the Department of Buildings how the fee for your permit type is calculated.

The City can post a stop work order. Work resumes after the required permit is obtained and the stop-work penalty is paid, the permit fee is tripled in most cases, and the City may open an enforcement case. Confirm current amounts with the Department of Buildings.

No. The permit fee goes to the City. Drawings, expediter services, public way permits for scaffolding or a dumpster, and the construction itself are separate costs. Ask for each as its own line on the estimate.

Possibly. The City has a fee waiver for long-term senior homeowners age 65 and older who meet income criteria, for repairs and alterations on one to three unit buildings they live in. Confirm eligibility and the process with the Department of Buildings.

Where to go from here

Sources

  1. City of Chicago, Department of Buildings: Permits
  2. City of Chicago, Department of Buildings: Express Permit Program
  3. City of Chicago, Department of Buildings: Standard Plan Review Permit Program
  4. City of Chicago, Department of Buildings: Mason Contractor License
  5. City of Chicago: Guide to Building Permits: What Types of Work Do Not Require a Building Permit?
  6. City of Chicago, Department of Buildings: Permit Professional Lookup: Help
  7. City of Chicago: Guide to Building Permits: When Is a Licensed Architect or Engineer Required?
  8. City of Chicago: Guide to Building Permits: What Happens If I Start Work Without a Required Permit?

Facts last checked: October 7, 2026.

This article explains general rules and common situations in Chicago. It is not legal advice, and City rules change. For a specific property, check with the Chicago Department of Buildings or a licensed professional.

Talk to Akats

Not sure which permit your job needs?

Akats pulls permits for the work we do and handles expediting on its own. Tell us the job and we'll tell you what the City will want.

Request a Free Estimate

Tell us about the property. No obligation.

Free estimates subject to scope of project. We typically respond within one business day.

Call Free Estimate →